Multi-brand design system — when I designed one design system for 3 global brands
- Project
- Paragon, the B2B e-commerce of Signify, Cooper Lighting and Genlyte
- Scope
- Multi-brand design system, B2B e-commerce platform
- Role
- Design lead and design system designer
- Work
- Final design vision, design system, governance and team management
A few numbers
- Components in the design system
- 744
- Tokens, as Figma variables
- 186
- Brands in one system
- 3
- Months until every new screen used only the design system
- 6
- Less time to design and deliver screens
- 50–70%

The problem
How does one design system serve three brands, and how do you get your own team to use it?
The solution
A single design system, with a theme for each brand: Signify, Cooper Lighting and Genlyte. The 4 legacy systems became 1 B2B e-commerce platform, used on 3 continents, with each brand's skin. When the patterns matured, the time to design and deliver screens dropped by 50% to 70%.
My role
I owned the final design vision, meaning where the project wanted to land visually and structurally. I built the multi-brand design system from scratch and led the team that designed on top of it. The implementation came from the developers.
Signify had just bought Cooper Lighting and needed to unify its B2B portals, the e-commerce of people who buy lighting at scale. I joined this project, called Paragon, in 2021, through Tech Mahindra.
Sales, purchasing, orders and customization lived in 4 legacy systems, and much of an order's path was done by hand. Keeping all 4 was expensive, and a single platform cut that cost. What was manual, the portal automated.
What the project didn't have
The project didn't even have a dedicated library in Figma, let alone a design system, and this would be the company's first multi-brand one. The developers' framework was UI5, rigid for responsiveness, and Figma didn't have variables yet. Before opening the library, I gathered the brands' material, UI5's limits with the developers and the component inventory.
Decision 1 of 5
The decision to build one system with three themes
The problem
The platform had to serve Signify, Cooper Lighting and Genlyte, and only Signify had tokens ready.
The options
I weighed separate libraries, one per brand, and dropped the idea: the platform was almost identical across the 3, and only the theme and a few screens changed.
What I decided
I built a single design system, with one theme per brand. I started from Signify's tokens, built Cooper Lighting's and Genlyte's from scratch, from each brand's public site and identity manuals, and followed the architecture of the company's other systems, so ours would be easy to plug into them if they ever unified. I redid the colors, the typography and the page structure around what the product needed.
What changed
I started before Figma had variables, with a hand-built file that switched the skin of the 3 brands in a few clicks. When variables arrived, the switch took a single click, with the tokens as variables.
Decision 2 of 5
The decision to name things by their function
The problem
Each designer on the team had their own names, and when a file passed from one person to another, nobody understood anything. The developers got lost too, because the way the layers were organized didn't match the content.
The options
UI5's naming was a complex framework standard, and our names would have become very messy. The other way out was at its base: the HTML and CSS elements that designers and developers already knew.
What I decided
The standard was born whole, for tokens, layers and pages. A layer took the name of the element's function, and the content stayed out of the name: <title>, <label>, <input>, and <meta> for data that came from the back end. A token followed the order attribute, property, component, variant and state, as in color.background.button.primary.default. Each page of the file was a numbered chapter, with the piece's status in the name.
What changed
I enforced the standard in reviews, and the developers didn't take it into the code, because it didn't "match" their framework. Even so, handoff got easier, with everything organized and named in a way anyone recognized.
Decision 3 of 5
The decision to design our own input
The problem
The screens already carried a lot of information, and fields often had little room to exist. The default UI5 input would make everything heavier.
The options
I could use the UI5 input, which the developers already had, or take my own design and ask them to customize the component.
What I decided
I brought my design, with the label inside the field, always visible, turning bold when the field was active. With the label inside, the screen gave the feeling of everything in its place.
- Overview
- Anatomy
- Tokens
- Anatomy · measurements
- States
- Tokens · field
What changed
It came cheap: the developers built the component once and agreed without pushback. The same input came to serve the 3 brands, in all four states.
Decision 4 of 5
The decision to review every screen before handoff
The problem
The resistance to the system came from my own team, who kept using components from outside the library. Often the designer just didn't know how to customize an item that already existed.
The options
I tried to stop off-system components with a rule and couldn't. What was left was the review: looking at what the team delivered, screen by screen, before it reached the developers.
What I decided
I reviewed every screen before handoff, flagging what was outside the library, and trained the team in Figma. For what was missing, I created a file I called the parking lot: I reviewed each piece there and promoted it to the library.
- 01 · DesignerNew componentThe library lacked a piece, so the designer drew their own.
- 02 · DesignerParking lotA Figma file where the piece waited, outside the library.
- 03 · MeMy reviewI fixed what was off-standard. A screen with an outside piece went back to be redone.
- 04 · The whole teamLibraryOnce promoted, the piece served all 3 brands.
Before handoff, every screen went through the same review.
That path continued all the way to the code. The system's governance was mine, from requesting a new component to the acceptance checklist.
- 01 · MeChangelog and versionI approved every new version, and updates shipped weekly.
- 02 · Design and developersHandoffThe reviewed screen moved to the developers through the handoff flow.
- 03 · Design teamAcceptance checklistAfter development, the criteria checklist said whether the screen was accepted.
What changed
In about 6 months, every new screen used only the system, and the team requested what they needed. Leaving it always meant redoing a lot of work, and the team learned that in practice.
The price showed up in time: the system took about 2 years to become solid, because I was the only one looking after it while also handling all of the team management.
Decision 5 of 5
The decision to take accessibility to the checklist
The problem
The project director asked me to take on accessibility, and the WCAG audit found pages with more than 100 violations, in component names, heading hierarchy, keyboard navigation and alt text. In an alignment workshop, Signify's C-level wanted to implement the fixes, and the developers saw it as extra work.
The options
Even with the director pressing, development leadership wouldn't adjust the tags, seeing it as rework with no value. The other way out was to make the developers' job easier and take the tags into a process that already existed.
What I decided
I wrote out, item by item, why each point mattered and how to implement it, and suggested a backlog by page. The tags went into the final approval checklist: my team detailed them at handoff and checked them in the browser inspector.
What changed
- Of what I specified in design, implemented
- 100%
- Tags in the code
- Some
Implementation was partial: the design side went in whole, and only some tags reached the code, depending on demand and time. Contrast and typography almost always passed, because the library was built on those rules from the start and the developers didn't get the construction of the elements wrong.
The result
The 4 systems became 1 platform, used on 3 continents by customers, agents, distributors and architects. The portal went white label, and Cooper Lighting's is live as PRISM Portal. The design system lived through the 5 years I was on the project.
There was no metrics dashboard, so I measured through design tasks in Jira, comparing the first month after the page templates with the same period before them. On average, a task that took 3 to 5 days came down to 1 to 2, 50% to 70% less time. In the cart flow, the templates left little to customize:
What I learned and what I would do differently
It was a new market for me, and out of insecurity I put in little of my product vision and visual refinement, even with the autonomy to do so. There was also no clear roadmap, cascaded by delivery priority, which was a mistake of mine and of the project's management. I would set a baseline on day one, to show the before and after with numbers.